Volute Press
Screw Press
Sludge Press
Dewatering Press
Screw filter Press
Volute Dewatering
Dewatering Screw
Dewatering Machine
Screw Press Dewatering
Dewatering Equipment
Volute Dewatering Press
Sludge Dewatering Press
Sludge Machine
Sludge Screw Press
Volute Screw Press
Sludge Press Machine
Industrial Screw Press
Wastewater Screw Press
Sludge Dewatering Press 131
Sludge Dewatering Press 251
Sludge Dewatering Press 301
Sludge Dewatering Press 351
Sludge Dewatering Press 401
Sludge Dewatering Press 404
Wastewater Screw Press
24 hours fully automatic operation.
No clogging, reducing flushing water consumption.
Suitable for various kinds of sludge dewatering.
Higher dehydration efficiency than traditional equipment.
Low power consumption, basically no vibration and noise on site.
Wastewater Screw Press
Description
JX Wastewater Screw Press combines a PLC control cabinet, a sludge thickening, dewatering body and a flocculation box. It can achieve efficient flocculation under the condition of fully automatic operation and continuously complete the sludge thickening and dewatering work.
The collected filtrate can be reused or discharged, and the dehydrated sludge is discharged. Replace the traditional filter cloth and centrifugal filtration method with a unique and subtle filter structure. It is widely used in municipal sewage treatment, river dredging, food, grease, chemical, paper and other industries.
Best Factory, Best Product. Contact Now !!!
Working Principle
The Sludge Screw Press is composed of main body, driving device, filtrate tank, mixing system, frame body, etc.
When it is working, the sludge is lifted to the mixing tank by the sludge pump. At this time, the dosing pump also quantitatively transports the liquid to the mixing tank, and the stirring motor drives the entire mixing system to combine the sludge with the liquid. This way could fully flocculate the material. When the liquid reaches the upper level of the liquid level sensor, it will send a signal to make the sludge screw press work. Under the action of the screw shaft, the sludge is lifted to the sludge outlet gradually, and the filtrate flows out from the gap between the fixed ring and the moving ring. The inner cavity formed by the screw shaft and the ring sheet is filled with flocculated particles, which are conveyed and squeezed to create a mud cake during the rotation of the end back pressure plate. The screw shaft rotates and pushes and continuously drives the movement of the moving ring up and down, left and right to clean the filter slits to prevent clogging.
- Reduce the labor intensity of the operators and the daily maintenance time.
- Innovative structure: It is suitable for various types of sludge with high and low viscosity, especially oily sludge.
- Fully enclosed working design: reduce the on-site odor and improve the working environment.
- Reduce the overall land occupation and construction costs of sewage treatment facilities.
- PLC automatic control system is adopted to draw out sludge, inject the chemical liquid, and discharge sludge cake.
- Municipal wastewater
- Food
- Beverages
- Slaughtering and breeding
- Printing
- Petrochemical engineering
- Paper making
- Tannery
- Pharmaceutical,etc.
Wastewater Screw Press
Related Product
Wastewater Screw Press
Our Service
Professional Pre-sale
Service
Filtration method and
equipment recommendation
Free CAD or 3D
drawing provided
Free phone call
Complete Service
During Sales
On time delivery
Equipment inspection
by photo or video
Secure and standard
package provided
After Sales Service
Installation assist by
phone call or video
Free accessories provide
for maintenance
Engineer sent for
solving onsite problem
Wastewater Screw Press
FAQ
Where is your factory?
We have three factories in Sichuan, Hebei, Jiangsu. Because the difference of customer locations, raw material price, factory wages and other considerations. In this way, we can provide the best quality product with lower cost.
Do you have a certification?
Yes. we have ISO/CE/BV/SGS/TUV certificate and patent certificate.
How about the delivery time?
Usually 1-15 days after prepayment is confirmed.
Do you have a design team?
Yes, we have. Providing drawing, electric drawing and others.
What is your payment?
T/T, L/C, Western Union, Paypal.
Can you provide certificate of origin?
yes, we can provide CO as well as FORM E, FOEM F and etc.
Can you accept OEM?
Yes, we could do OEM for you.
Can you send me a sample?
Yes.1-3 days for delivery.