More than 10000 customers have ordered our products.
  • Sludge Dewatering Press 251
  • Sludge Dewatering Press 251
  • Sludge Dewatering Press 251

    Sludge Dewatering Press 251

    Good at dewatering oily sludge.

    Low-speed operation, no vibration and low noise.

    Covering a small foot space but full function.

    Suitable for medium and small sewage treatment plants.

    Low power consumption: the speed of the screw shaft is 2-3rpm.

    In Stock, Contact Now >>>

    Sludge Dewatering Press 251

    Description

    JX Sludge Dewatering Press 251 has a 15-30 kg/h dry sludge treatment capacity with one unit screw press main body. It integrates an automatic control cabinet, flocculation and conditioning tank, sludge thickening and dewatering body, and liquid collecting tank.

    Sludge Dewatering Press 251 Sludge Dewatering Press 251

    Besides, sludge dewatering press 251 can realize high-efficiency flocculation under the condition of fully automatic operation and continuously complete sludge thickening and squeezing and dewatering work.

    Sludge Dewatering Press 251 Sludge Dewatering Press 251

    Best Factory, Best Product. Contact Now !!!

    Working Principle

    Extraction: When the spiral promotes the rotation of the shaft, the static and active laminations move in relativity. Under the effect of the force, the water is filtered out from the gaps of the laminations. Drying: The sludge after extraction is continuously moved forward with the rotation of the spiral shaft along the direction of the mud cake outlet. The pitch of the spiral shaft is gradually reduced, and the gap between the ring and the ring is also steadily declined. The volume of the cavity is continuously condensed. Under the effect of the inlet and outlet back pressure plate, the internal pressure is slowly increased. With the continuous operation of the promoting spiral shaft, the water in the sludge is discharged by extrusion, and the solid content of the filter cake continues to rise. Self-cleaning: The rotation of the spiral shaft promotes the continuous rotation of the dynamic ring. The equipment establishes a continuous self-cleaning process by the movement between the fixed ring and the dynamic ring, thereby preventing the common blocking problem in the traditional dehydrator.

    Sludge Dewatering Press 251
    Advantages
    • Adopting stainless steel static and active laminations for better separation effect.
    • Self-cleaning function is available with less water consumption.
    • Operating automatically and the working speed is adjustable.
    • Compact structure and lightweight: can be moved to any production site.
    • Fully enclosed working design: reduce the on-site odor and improve the working environment.
    Application
    • Municipal wastewater
    • Food
    • Beverages
    • Slaughtering and breeding
    • Printing
    • Petrochemical engineering
    • Paper making
    • Tannery
    • Pharmaceutical,etc.

    Sludge Dewatering Press PDF Download

    Sludge Dewatering Press 251

    Our Service

    Professional Pre-sale
    Service
    aboutus/OurServices1

    Filtration method and
    equipment recommendation

    aboutus/OurServices2

    Free CAD or 3D
    drawing provided

    aboutus/OurServices3

    Free phone call
     

    Complete Service
    During Sales
    aboutus/Complete1

    On time delivery
     

    aboutus/Complete2

    Equipment inspection
    by photo or video

    aboutus/Complete3

    Secure and standard
    package provided

    After Sales Service
     
    aboutus/After1

    Installation assist by
    phone call or video

    aboutus/After2

    Free accessories provide
    for maintenance

    aboutus/After3

    Engineer sent for
    solving onsite problem

    Sludge Dewatering Press 251

    FAQ

    Where is your factory?

    We have three factories in Sichuan, Hebei, Jiangsu. Because the difference of customer locations, raw material price, factory wages and other considerations. In this way, we can provide the best quality product with lower cost.

    Do you have a certification?

    Yes. we have ISO/CE/BV/SGS/TUV certificate and patent certificate.

    How about the delivery time?

    Usually 1-15 days after prepayment is confirmed.

    Do you have a design team?

    Yes, we have. Providing drawing, electric drawing and others.

    What is your payment?

    T/T, L/C, Western Union, Paypal.

    Can you provide certificate of origin?

    yes, we can provide CO as well as FORM E, FOEM F and etc.

    Can you accept OEM?

    Yes, we could do OEM for you.

    Can you send me a sample?

    Yes.1-3 days for delivery.

    Refund immediately if not satisfied.